Originally conceived as a ring road in the 1940s, the concept evolved into a pair of at-grade four lane boulevards known as Henry Sturm Boulevard (east–west) and Dryden Boulevard (north–south), for which land was gradually purchased through the 1950s and into the early 1960s. The completion of Highway401 between Toronto and Highway8 in 1960 resulted in businesses relocating closer to it; consequently, traffic planners redesigned the boulevards into a continuous four lane expressway in 1962.
Construction of the Kitchener–Waterloo Expressway began in 1966 with the rebuilding of King Street East into a divided highway. This project also resulted in the construction of the interchange with the future expressway, which was named the Conestoga Parkway in 1967. The northern and western legs were built outwards from this interchange simultaneously over the following five years, opening in sections between 1968 and 1971. At that time, the route extended west to Fischer-Hallman Road and north to the southern interchange with King Street North. Two lane extensions opened in 1973 and 1977 to connect the parkway with New Hamburg and St. Jacobs, respectively. Portions of these were expanded to four lanes in the early 1990s. A series of projects saw the parkway completely rebuilt through its central section between the mid-1990s and early 2010s, including a concrete median barrier, additional lanes, and a new flyover ramp at Highway8.
An ongoing but frequently delayed project to construct a new freeway between Kitchener and Guelph will see a new interchange built at the existing Wellington Street interchange, in addition to the numerous bridges that have already been lengthened in the vicinity. There is currently no projected timeline for the construction of completion of this project as of 2022.
Route description
The Conestoga Parkway is a 20.7-kilometre (12.9 mi)[1] controlled-access freeway serving the twin cities of Kitchener and Waterloo. The route, which forms the rough shape of a backwards "L", serves as the backbone of the two cities. As the concurrency of Highway7 and Highway8 enters the city of Kitchener as a freeway from the west, it takes on the name Conestoga Parkway at the Waterloo Regional Road 70 (Trussler Road) exit at the western edge of the city. The parkway travels east until Highway8 diverges southeast toward Cambridge. Now carrying only the Highway7 designation, the Conestoga Parkway curves northward. At the Frederick Street and Victoria Street interchange, Highway7 exits the parkway and follows Victoria Street east toward Guelph; the parkway henceforth is signed as Highway85 to its northern end, which lies approximately 750 metres (820 yd) north of the Waterloo city limits.[2][3]
The Conestoga Parkway is maintained by the Ministry of Transportation of Ontario (MTO), which officially refers to it as the Kitchener–Waterloo Expressway.[4]
The speed limit on the parkway is 90 kilometres per hour (55 mph) throughout its length.[5]
Western leg
At the Kitchener city limits at Trussler Road the concurrency of Highway7/8 continues west as a four lane freeway towards Stratford.[3] Within Kitchener, the Conestoga Parkway consistently acts as the boundary for neighbourhoods to either side of it.[6]
Initially, it is sandwiched between the suburban residential neighbourhoods of Forest Heights and Laurentian West neighbourhoods, to the north and south respectively, as it travels east to Regional Road58 (Fischer–Hallman Road). There the median switches from grass to a concrete barrier, and the parkway widens to six lanes. It passes north of the Sunrise Shopping Centre before once again bisecting residential neighbourhoods, namely Forest Hill and Meinzinger Park to the north and Laurentian Hills to the south.[2][3][6]
Approaching the Regional Road28 (Homer Watson Boulevard) interchange – which provides access to Regional Road 4 (Ottawa Street) – retail and light industry in the Alpine neighbourhood begin to flank the southern side of the Conestoga Parkway. It then crosses over the Canadian National Railways Huron Park spur, the adjacent ION LRT line, and Schneider Creek immediately west of an interchange with Regional Road53 (Courtland Avenue). Now serving as the boundary between the residential neighbourhoods of Rockway to the north and Vanier to the south, the route curves north-northeast to reach an interchange with the Freeport Diversion (also known as the King Street Bypass or Highway8 expressway).[2][3][6]
Northern leg
The portion of the Conestoga Parkway that travels perpendicular to King Street East follows alongside Montgomery Creek. Now eight-lanes wide, it passes over Weber Street and then curves north-northwest to avoid the Stanley Park Conservation Area, with the neighbourhoods of Eastwood to the west, and Stanley Park to the southeast.[3][6] The parkway follows the former alignment of Edna Street north to Frederick Street,[7]
with the neighbourhoods of Auditorium and Central Frederick to the west, and Rosemount to the east. It briefly swerves northwards, passing under Frederick Street, Victoria Street and the Kitchener GO line in quick succession. An interchange serves both Frederick Street and Victoria Street, via the parallel roads of Regional Road62 (Edna Street) and Regional Road61 (Bruce Street); an interchange with Wellington Street follows soon thereafter. Due to the close proximately of these two interchanges, the Conestoga Parkway utilizes a brief local–express system for approximately 1.7 kilometres (1.1 mi).[2][3][6]
Now passing through light industry in the Northward neighbourhood, the Conestoga Parkway makes a broad curve to the west to avoid the Grand River and meets Regional Road29 (Lancaster Street), which features a partial interchange. The median barrier ends immediately after, and a grass median begins. To the south is the neighbourhood of Fairfield, while Bridgeport lies to the north. The route gradually curves back to the north and enters the city of Waterloo at Regional Road9 (Bridgeport Road), with which there is an interchange.[2][3][6]
The Conestoga Parkway enters into Waterloo with the suburban neighbourhood of Lincoln Heights to the west and greenfields and Betchel Park to the east. After 1.5 kilometres (0.93 mi), it crosses Laurel Creek and encounters an interchange with Regional Road57 (University Avenue) before curving gradually to the west-northwest. With the neighbourhoods of Lincoln West to the south and Foxhunt to the north, the parkway encounters the first of two interchanges with Regional Road 15 (King Street North); Conestoga Mall lies to the northeast. It becomes parallel to Forwell Creek as it curves back northward, after which the parkway travels parallel to and east of the Waterloo Central Railway for the remainder of its length. An interchange with Regional Road50 (Northfield Drive) also carries the ION LRT line over the route as it travels through an area of light industry. Just prior to the second interchange with King Street North, the Conestoga Parkway exits Waterloo into the township of Woolwich.[2][3][8]
Both the parkway and Highway85 end approximately 350 metres (1,150 ft) north of King Street North, after which the four lane freeway narrows and is known as Waterloo Regional Road85.[1][3]
History
Planning and construction
Although the concept of a ring road around Kitchener and Waterloo originated from the Kitchener-Waterloo and Suburban Planning Board in 1948,[9][10]
actual consideration was not given to it until it was recommended by a 1961 traffic study.[11]
By then, the opening of Highway 401 was attracting business away from the rapidly growing twin cities. Land was gradually purchased over the intervening years and picked up considerably when plans for the expressway system were first raised in late 1962.[9]
The ring road prior to this point had evolved to a proposed pair of east–west and north–south four lane boulevards known as Henry Strum Boulevard and Dryden Boulevard. However, Kitchener planning director Bill Thompson changed this to a single controlled-access highway.[12]
The Department of Highways had already begun construction in the fall of 1961 on the Freeport Diversion, providing a new divided crossing of the Grand River along Highway 8. The diversion, connecting with King Street south of the Grand River and at Fergus Street, was completed in 1963.[13][14][15]
The provincial government reached a funding arrangement with Kitchener and Waterloo to cover 75% of the expected C$22 million ($211 million in 2023 dollars).[16] cost, and officially announced the Kitchener–Waterloo Expressway on May21, 1964.[17]
The province eventually took over authority for the entire project in August 1965.[18]
Construction began in February 1966 with the awarding of a C$3 million ($26.9 million in 2023 dollars).[16] contract to rebuild 2.7 kilometres (1.7 mi) of King Street into a four lane divided highway from Fairway Road (renamed from Block Line Road in 1965) to Doon Road,[19]
including the half cloverleaf interchange that would serve the western and northern legs of the expressway system.[20]
A ground-breaking ceremony was held in the fall of that year, with dignitaries taking turns driving a bulldozer.[21]
In anticipation of the long-term construction, Highway8 was redirected along Fairway Road, Mill Street (now Vanier Drive) and the short section of Henry Sturm Boulevard that was constructed from Ottawa Street and Highland Road to Mill Street.[22][23]
The reconstruction of King Street was completed and opened in November 1967.[24]
The Kitchener–Waterloo Expressway was unofficially renamed the Conestoga Parkway in January 1967 by a joint committee of the two cities. A shortlist of 12 publicly-submitted names was prepared, and included Mackenzie King, John Patrick, Eby-Erb (early Mennonite settlers), Dan Detweiller (a founder of the Ontario hydroelectric system[25]), Frederick Banting, Centennial, Pioneer, Grand Valley, Golden Triangle, The Kingsway, and Conestoga. The name, a reference to the Mennonite conestoga wagon used by early settlers, was chosen unanimously by the committee.[26]
On the northern leg of the parkway, early works construction along Edna Street, including the removal of several dozen homes, began in 1966, and tenders were called for construction of the route from King Street to Frederick Street in September. Full construction on the C$1.9million ($16.5 million in 2023 dollars).[16] contract began in April 1967.[21][27][28]
It was completed and opened to traffic on September19, 1968.[29][30]
Another contract, to build the parkway from Frederick Street and Bridgeport Road, was awarded that month for C$5.1million ($42.6 million in 2023 dollars).[16], with construction beginning in October.[31][32]
On the western leg of the parkway, construction began in October 1967 on a C$3.6 million ($31.2 million in 2023 dollars).[16] contract to build a 2.9-kilometre (1.8 mi) segment of the parkway from King Street to west of Homer Watson Boulevard.[33]
This section, which was built along the alignment of Henry Strum Boulevard, was opened to traffic between Courtland Avenue and King Street on November25, 1968.[21][34]
Work continued on the Conestoga Parkway into the early 1970s. On the northern leg, the segment under construction between Frederick Street and Bridgeport Road was completed and opened on October5 or 6, 1970.[35][36]
Just over a month later, on November13, the first portion of the expressway within Waterloo was opened ceremoniously by Minister of Highways George Gomme.[37]
Construction of this section, through undeveloped farmland between Bridgeport Road and the southern interchange with King Street North, took place beginning in 1969.[38]
On the western leg, a section between Courtland Avenue and Fischer-Hallman Drive opened on September1, 1971, completing the Kitchener–Waterloo Expressway project.[21][39]
By this time, construction was underway on a new two lane alignment of Highway7/8, first announced in 1963, to connect the New Hamburg Diversion with the Conestoga Parkway at Fischer-Hallman Drive. It opened on August13, 1973, bypassing the community of Baden.[40][41]
To the north, construction of a two lane alignment of Highway 85 to connect the Conestoga Parkway, at the southern intersection of King Street North, with the St. Jacobs Bypass began in 1974. The extension, which featured an at-grade intersection with Northfield Road and a grade-separation with the northern King Street North, was opened in late August, 1977.[42]
Since completion
As each section of the Conestoga Parkway opened, the DHO moved portions of Highways7, 8 and 85 onto it. By 1972, the current configuration of the three highways was established.[43]
However, in 1980 or 1981, Highway85 was renumbered as Highway86.
[44][45]
It remained as such until the spring of 2003, when several highways in Ontario were renumbered to improve route number continuity and aid navigation. Among them was the renumbering of Highway86 back to Highway85, restoring the original numbering scheme of the parkway.[46][47]
The two lane segment of Highway 7/8 from Fischer-Hallman Road west to Baden was originally slated to be twinned to four lanes in the 1980s, but the project was put off for a decade. Early works tree clearing got underway in 1991 before being put on hold for archeological excavations.[48][49][50]
Construction began to widen the route as far west as Waterloo Regional Road12 (Queen Street), south of Petersburg, on July6, 1992, with a planned completion by August 1993.[51]
The Conestoga Parkway interchange with the Freeport Diversion. The flyover was constructed to remedy a half-cloverleaf infamous for weaving.
The lack of a median barrier between the opposing lanes of the parkway led to numerous crossover collisions; between May 1990 and July 1993, eight deaths were directly attributed to vehicles crossing the grass median and striking vehicles in the opposing lane head on.[52]
Following the death of Laurie Brain on April8, 1990, a coroners jury on October9, 1991, recommended several immediate improvements to the parkway, including the installation of a median barrier as well as lowering the speed limit from 100 kilometres per hour (62 mph) to 90 kilometres per hour (56 mph).[53]
The speed limit was reduced to 90km/h on January11, 1994,[54]
while construction to install a barrier between Frederick Street and Lancaster Street began in July 1994.[55]
The work, which also included the construction of storm drainage, was completed by the summer of 1995.[56]
Construction of a barrier between Homer Watson Boulevard and Frederick Street began in July 1997,[57]
and was completed by November.[58]
In the early 1990s, the provincial government announced plans to widen the Conestoga Parkway and Freeport Diversion, as well as to improve the interchange between the two.[59]
The project was broken into several phases, and included rebuilding the Ottawa Street and Franklin Street overpasses.[60]
Construction began in August or September 1998 to widen the Conestoga Parkway from four to six lanes between Courtland Avenue and King Street, from four to eight lanes between King Street and Ottawa Street, and from four to six lanes between Ottawa Street and Frederick Street.[61]
This stage of the project was completed in July 2000.[62]
The expansion of Highway8 from four lanes to eight lanes between the Conestoga Parkway and Fergus Avenue was originally scheduled to begin in 2001, but was delayed as businesses along Weber Street fought expropriation.[63]
Construction instead began in April 2002, which involved shifting one of the retaining walls further north and a new Franklin Street bridge to accommodate the eight lane cross-section freeway. Included with this project was a reconstruction of the bottle-necked interchange of the Conestoga Parkway and Highway8, including a new flyover ramp from westbound Conestoga Parkway to eastbound Highway8 to replace one of the two loop ramps, and realignment of the northbound to eastbound ramp.[64]
Both were completed and opened on June11, 2004.[65]
Construction began in 2012 to widen the parkway to six lanes from east of Courtland Avenue to west of Fischer-Hallman Road, including the installation of a median barrier.[66]
The C$130 million project was completed in 2016.[67]
Future
Long term plans have called for the construction of a freeway link between Kitchener and Guelph, linking the Conestoga Parkway with the Hanlon Expressway (Highway 6). Although proposed in the 1980s, construction did not begin until 2015.[68]
Opposition arose due to the new alignment of this Highway7 freeway passing through environmentally sensitive lands. In particular, the $25 million cost of the interchange between the new freeway and the Conestoga Parkway; the high cost is partly due to land acquisition to accommodate the proposed flyover ramps. This represents a quarter of the projected C$100million budget for the total Highway7 project.[69][70]
The Victoria Street overpass was demolished overnight on February23–24, 2018, and was replaced with a new structure that reopened to traffic on October28; the new bridge is longer and has a higher elevation to accommodate the future ramps between Highway7 and the Conestoga Parkway.[71][72]
Eastern end of Highway 7 designation; Highway 85 southern terminus; access to Victoria Street and Frederick Street via Bruce Street (northbound) and Edna Street (southbound)
^ abcdefPlanning Communities(PDF) (Map). Cartography by Geospatial Data and Analytics, Technology Innovation and Services, Corporate Services. City of Kitchener. March 19, 2022. Retrieved March 20, 2022.
^"Drivers get feel of parkway". Waterloo Chronicle. June 19, 1968. p. 13. Retrieved March 20, 2022 – via Waterloo Public Library.
^Outhit, Jeff (March 8, 2002). "Freeport Bridge to get $1.6-million overhaul". The Record. p. B1. ProQuest266974851(subscription required).
^Annual Report (Report). Ontario Department of Highway. March 31, 1962. p. 32. Retrieved March 6, 2022. Work on the dual highway diversion of Highway 8 at Freeport, with structures, was begun in the fall of 1961.
^Annual Report (Report). Ontario Department of Highway. March 31, 1963. p. 31. Retrieved March 6, 2022.
^ abcdThompson, Bill (2014). "Commencement of Construction for the Expressway". The Conestoga Parkway vision to reality: with some stories and events along the way. Pandora Print Shop. p. 61.
^Annual Report (Report). Ontario Department of Highway. March 31, 1968. p. 10. In November the first major contract for the Kitchener-Waterloo Expressway, a two-mile section of King Street in Kitchener, was completed.
^"The finishing touch". Waterloo Chronicle. August 3, 1977. p. 8. Retrieved April 1, 2022 – via Waterloo Public Library.
^Ontario Road Map (Map). Cartography by Cartography Section. Ministry of Transportation and Communications. 1972. Kitchener Waterloo inset. Retrieved April 1, 2022 – via Archives of Ontario.
^Ontario Road Map (Map). Cartography by Cartography Section. Ministry of Transportation and Communications. 1980–81. South-Central Ontario inset. Retrieved April 1, 2022 – via Archives of Ontario.
^Ontario Road Map (Map). Cartography by Cartography Section. Ministry of Transportation and Communications. 1982–83. South-Central Ontario inset. Retrieved April 1, 2022 – via Archives of Ontario.
^Cannon, Steve (October 23, 1997). "Barriers nearly up on parkway". The Record. p. B10. ProQuest275504042(subscription required).
^Crone, Greg (February 11, 1992). "Province must find alternative to road widening, Wagner says". The Record. p. B2. ProQuest275282812(subscription required).
^Crowley, Kevin (February 13, 1998). "Parkway plans miff neighbors". The Record. p. B1. ProQuest275522021(subscription required).
^Goodwin, Carol (July 21, 2000). "Overpass woes will blossom in spring". The Record. p. B01. ProQuest266880910(subscription required).
^Burtt, Bob (October 12, 2001). "Highway 8 project on back burner". The Record. p. A01. ProQuest266960877(subscription required).
^Caldwell, Brian (April 27, 2002). "Highway bottleneck surgery starts". The Record. p. A1. ProQuest266981212(subscription required).
^"Enjoy the ride". The Record. June 10, 2004. p. A12. ProQuest267094832(subscription required). It cost $29 million and took three years of construction work, but the most loathed and clearly one of the most dangerous interchanges in Waterloo Region is being closed and replaced by a new flyover. If the weather co-operates, this two-lane, 800-metre long engineering marvel which boasts its own automatic, de-icing system will open in time for tomorrow morning's rush hour.
^"Sign off? Overhead billboard will light up when Highway 7/8 widening finishes". The Record. January 22, 2016. p. B3. ProQuest1758853564(subscription required).
^The Regional Municipality of Waterloo (June 2020). Region of Waterloo [Region Base Map] (PDF) (Map). 1:100,000. Cartography by Information & Technology Services. The Regional Municipality of Waterloo.
يفتقر محتوى هذه المقالة إلى الاستشهاد بمصادر. فضلاً، ساهم في تطوير هذه المقالة من خلال إضافة مصادر موثوق بها. أي معلومات غير موثقة يمكن التشكيك بها وإزالتها. (ديسمبر 2018) هذه المقالة يتيمة إذ تصل إليها مقالات أخرى قليلة جدًا. فضلًا، ساعد بإضافة وصلة إليها في مقالات متعلقة بها...
Pertempuran FuzhouCombat naval de Fou-Tchéou馬江海戰Bagian dari Perang Tiongkok-PrancisPertempuran Fuzhou, 23 Agustus 1884 (lukisan abad ke-19).Tanggal23-26 Agustus 1884LokasiPelabuhan Mawei, Fuzhou, TiongkokHasil Prancis menangPihak terlibat Dinasti Qing PrancisTokoh dan pemimpin Zhang Peilun Amédée CourbetPasukan Armada Fujian Skuadron Timur JauhKekuatan 22 kapal(11 kapal bergaya Barat, sisanya kapal jung) 13 kapalKorban 796 tewas150 luka-luka51 hilang9 kapal tenggelam10+ kapal rusak...
السياحة في البوسنة والهرسك شلالات كرافيتسه معلومات أخرى منطقة زمنية توقيت وسط أوروبا (ت.ع.م+1) رمز المنطقة +387 الموقع الرسمي Official Tourist webpage تعديل مصدري - تعديل يعد قطاع السياحة في البوسنة والهرسك قطاعا سريع النمو كما يشكل جزءا مهما في اقتصاد البلد. بيئة الأعمال السياحية في ...
The Weeknd discographyThe Weeknd in 2021Studio albums5Live albums1Compilation albums3EPs9Singles72Soundtrack albums1Mixtapes3Promotional singles7 The discography of Canadian singer-songwriter the Weeknd consists of five studio albums, nine extended plays, three mixtapes, three compilation albums (including two greatest hits albums), one soundtrack album, one live album, 72 singles (including 22 as a featured artist), and seven promotional singles (including two as a featured artist). Accordin...
Sport competition Main article: 2015 Rugby World Cup Pool C of the 2015 Rugby World Cup began on 19 September and was completed on 11 October 2015.[1] The pool was composed of New Zealand (the title holders), Argentina and Tonga – who all qualified automatically for the tournament due to finishing in the top three positions in their pools in 2011 – along with the top European qualifier, Georgia, and the top African qualifier, Namibia. After winning the fi...
American film studio Warner Bros. PicturesLogo since 2023Formerly Warner Bros. Pictures, Inc. (1923–1967) Warner Bros.-Seven Arts, Inc. (1967–1969) Warner Bros. Inc. (1969–1992) TypeSubsidiaryIndustryFilm productionPredecessorWarner Features CompanyFoundedApril 4, 1923; 100 years ago (1923-04-04)Founders Harry Warner Albert Warner Sam Warner Jack L. Warner HeadquartersBurbank, California, U.S.Area servedWorldwideKey peopleMichael De Luca and Pamela Abdy (co-chairperson...
Комітет Верховної Ради України з питань прав людини, деокупації та реінтеграції тимчасово окупованих територій у Донецькій, Луганській областях та Автономної Республіки Крим, міста Севастополя, національних меншин і міжнаціональних відносин — утворений 29 серпня 2019 у �...
Yugoslav long jumper (1951–2021) This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Nenad Stekić – news · newspapers · books · scholar · JSTOR (July 2021) (Learn how and when to remove this template message) Nenad Stekic (1976) Nenad Stekić Medal record Representing Yugoslavia Men's athletics European...
Welsh communist and anti-apartheid activist (1883–1924) David Ivon JonesJones circa 1910Born(1883-10-18)18 October 1883Aberystwyth, Cardiganshire, WalesDied13 April 1924(1924-04-13) (aged 40)Yalta, Soviet UnionResting placeNovodevichy Cemetery, MoscowOther namesThe Delegate for AfricaOccupation(s)Journalist, grocer, trade unionistOrganization(s)Industrial Workers of Africa (IWA).War on War League.Known forOpposition to apartheid.Translating many of Lenin's works into English....
Australian Army soldier and officer Sir Stanley George SavigeCaptain Stanley Savige of the Australian Imperial Force, 1918Nickname(s)StanBorn(1890-06-26)26 June 1890Morwell, VictoriaDied15 May 1954(1954-05-15) (aged 63)Kew, VictoriaBuriedBoroondara General CemeteryAllegianceAustraliaService/branchAustralian ArmyYears of service1915–1946RankLieutenant GeneralService numberVX13Commands heldII Corps (1944–45)New Guinea Force (1944)I Corps (1944)3rd Division (1942–44)17th Infantry...
This article does not cite any sources. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Pop'n'gum – news · newspapers · books · scholar · JSTOR (June 2019) (Learn how and when to remove this template message) 2004 studio album by SuperbusPop'n'GumStudio album by SuperbusReleasedJune 2004GenreRock, power popLength33:58LabelMercury France, UniversalProducerDa...
Artikel ini kemungkinan menggunakan bahan sumber dengan gaya penulisan tabloid atau jurnalisme tabloid yang dapat tidak sesuai dengan kebijakan Wikipedia tentang pemastian, kenetralan, atau sumber tepercaya. Silakan bantu perbaiki dengan mengganti sumber-sumber tersebut dengan mengutip ke sumber yang independen, netral, dan pihak ketiga. (Pelajari cara dan kapan saatnya untuk menghapus pesan templat ini)Artikel ini membutuhkan rujukan tambahan agar kualitasnya dapat dipastikan. Mohon bantu ka...
Branch of literary criticism that investigates the origins of ancient text Part of a series on theBible Canons and books Tanakh Torah Nevi'im Ketuvim Old Testament (OT) New Testament (NT) Deuterocanon Antilegomena Chapters and verses Apocrypha Jewish OT NT Authorship and development Authorship Dating Hebrew canon Old Testament canon New Testament canon Composition of the Torah Mosaic authorship Pauline epistles Petrine epistles Johannine works Translations and manuscripts Dead Sea scrolls Mas...
This article does not cite any sources. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Float b-boy move – news · newspapers · books · scholar · JSTOR (February 2009) (Learn how and when to remove this template message) A stationary float with leg position similar to that of a Nike kick. The float (turtle) is a b-boying move originally coming from basic Gymnas...
Austrian footballer Kai Schoppitsch Personal informationFull name Kai Walter SchoppitschDate of birth (1980-05-02) 2 May 1980 (age 43)Place of birth Wolfsberg, AustriaHeight 1.75 m (5 ft 9 in)Position(s) MidfielderTeam informationCurrent team SV Austria KlagenfurtYouth career1995–2001 FC KärntenSenior career*Years Team Apps (Gls)2001–2002 SK Austria Kärnten 27 (0)2002–2004 Red Bull Salzburg 40 (1)2004–2006 SK Austria Karnten 51 (1)2006–2009 SC Rheindorf Altach ...
Locality in Northern Ireland This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Salloon, County Fermanagh – news · newspapers · books · scholar · JSTOR (July 2015) (Learn how and when to remove this template message) 54°25′49″N 7°35′35″W / 54.43028°N 7.59306°W / 54.43028; -7....
2007 Australian filmAll My Friends Are Leaving BrisbaneOfficial Production PosterDirected byLouise AlstonWritten byStephen VaggBased onplay by Stephen VaggProduced byLouise Alston Jade van der LeiStarringCharlotte Gregg Matt Zeremes Cindy Nelson Ryan Johnson Romany Lee Gyton Grantley Sarah KennedyCinematographyJudd OvertonEdited byNicola ScarrottMusic byCaitlin YeoDistributed byAccent FilmRelease dateOctober 2007 (AUS)Running time76 minutesCountryAustraliaLanguageEnglishBudgetA$42,000 All My ...
Historic church in New Jersey, United States United States historic placeGrace Church or Grace Episcopal ChurchU.S. National Register of Historic Places Seventh Street entranceShow map of Union County, New JerseyShow map of New JerseyShow map of the United StatesLocation600 Cleveland AvenuePlainfield, New JerseyCoordinates40°37′5″N 74°25′2″W / 40.61806°N 74.41722°W / 40.61806; -74.41722Area1.7 acres (0.69 ha)Built1892ArchitectRobert W. Gibson; Charles ...