The airport, which was a hub for Aero Virgin Islands in the 1970s and 1980s, can receive jets up to the size of the Boeing 747s. Before 1996 the airport was known as Alexander Hamilton International Airport.[2]
History
During World War II, the United States Army Air ForcesSixth Air Force stationed the 12th Bombardment Squadron (25th Bombardment Group) at the airport for antisubmarine patrols flying B-18 Bolo aircraft from November 8, 1941, to November 10, 1942. During the time the military operated the airport, it was called Benedict Airfield. When the airport was transferred to civilian control, it was renamed to honor former St. Croix resident Alexander Hamilton.
On November 11, 2018, the world's second-largest cargo airplane, the Antonov An-124, landed on St. Croix to deliver building supplies for houses as part of the hurricane recovery.[7]
Facilities and aircraft
Henry E. Rohlsen Airport covers an area of 1,455 acres (589 ha), which contains one asphalt-paved runway (10/28) measuring 10,004 ft × 150 ft (3,049 m × 46 m). For the 12-month period ending September 30, 2013, the airport had 36,287 aircraft operations, an average of 99 per day: 68% air taxi, 25% general aviation, 6% scheduled commercial and 1% military. In the same period, 36 aircraft were based at this airport, including 11 single-engine, 15 multi-engine, five jets, four military aircraft and one helicopter.[1]
Terminal modernization and expansion project
In August 2018, the Virgin Islands Port Authority (VIPA) held a charrette to announce and discuss the terminal's expansion and renovation.[8][9][10][11][12] On March 14, 2019, the VIPA announced that bidding for phase one of the upgrade project would be in September.[13][14] The renovation was expected to be complete within a year.[15]
VIPA had begun the Henry E. Rohlsen Airport Terminal Expansion and Modernization Project as of September 2020. The improvements to the terminal will be completed in four phases over a six-year period.
Phase one entails enclosing 5,500 square feet of walkway space to increase the lounge's seating capacity, refurbishing the existing passenger lounge space and restrooms, enclosing the 1,100-square-foot open-air gardens with a new roof structure to provide additional concessions space, and upgrading the mechanical systems for the additional air-conditioned area.
Phase one is estimated to cost $8.6 million and was funded by a $7 million grant from the U.S. Department of Commerce Economic Development Administration in 2019 with a local match of $1.6 million from the VI Port Authority. The construction was anticipated to take 18 months and end in March 2022, but was ahead of schedule and ended on December 21, 2021.[16]
Phases two through four include the addition of a second level to accommodate jet bridges, additional hold room, concession and retail space, improvement of passenger flow and baggage handling in the terminal; redesign, expansion, and modernization of the interior of the terminal to make the best use of the existing floor plan; the addition of tropical landscaping; and changes to improve the flow of vehicular traffic. Expanding the terminal will allow St. Croix to take full advantage of its 10,000-foot runway.
While Phase 1 of the HERA Terminal Expansion is fully funded, VIPA is actively seeking funding sources for Phases 2 through 4. The project is estimated to cost $140 million.[17]
On July 24, 1979, Prinair Flight 610 crashed shortly after takeoff from Alexander Hamilton Airport. One crew member and seven passengers were killed.[24]
On December 7, 2017, at about 8:54 p.m., a private plane, a Beech Baron on its way to St. Thomas, had to return to St. Croix due to an emergency and crashed before it could make it to the runway, resulting in five fatalities.[25] A preliminary investigation revealed that engine failure caused the crash.[26] It was also revealed that the pilot operating the aircraft was unqualified to fly multi-engine airplanes.[27]