The aqueduct was constructed to cross Shooters Brook. It is built of stone with large voussoirs and retaining walls of coursed masonry and is 7.4 metres (24 ft) wide with triangular buttresses. The brook was culverted in about 1805 and Store Street was built over it. The canal is about 4.6 metres (15 ft) wide and 1.45 metres (4 ft 9 in) deep. The arch has a 7.6-metre (25 ft) square span and a 10.5-metre (34 ft) skew span rising 2.75 metres (9 ft) above road level.[2]
Generally, where a canal (or later a railway) crossed a road, or vice versa, the road would be diverted to cross at right angles. It had not always been acceptable but attempts to build masonry arch bridges at an angle, or "skew", of greater than about 15 degrees had proved unsatisfactory. The method up to that time had been to build the voussoir arch with the stone course work parallel to the abutments. This transmitted the load outward from the crown in a straight line to the foundations, parallel to the faces of the arch. If a skew was attempted, it threw the lines of force outside the abutments, leading to weakness in the structure.
William Chapman had partially solved the problem in 1787[3][4] when building bridges for the Kildare Canal, the first being the Finlay Bridge near Naas.[5] The Kildare was part of the Grand Canal Company, for which William Jessop had been the engineer. Jessop would no doubt have discussed it with Outram, his partner, and he experimented with the idea on the Rochdale Canal. Examples are Gorrell's Lane and March Barn road bridges, though it is possible that they were built later.[4] The method used was to build timber falsework parallel to the proposed arches. Planks were laid on the falsework parallel to the abutments. The position of the courses at the crown were marked out, then those across the remainder of the arch.
Although the aqueduct still exists, and is structurally sound, years of neglect led to water leakage through the joints, and the spiral construction can no longer be seen, the surface of the intrados having been rendered.
Later railway engineers improved on the system, producing what became known as helicoidal construction that became the norm in English skew bridge building. An exact solution to the problem was determined in the form of the French, or orthogonal, design. However, this was complicated and expensive to build.