Coinciding with the rebuilding of the airport's main terminal building, the station was moved a few hundred feet to the northwest, directly adjacent to the new terminal. Construction started in March 2020 and finished on October 25, 2021.[3]
Description
The station is located at 700 North Terminal Drive (immediately east of the Terminal),[Note 1][5] with the island platform extending east from the terminal. Unlike many TRAX stations, Airport does not have a Park and Ride lot. Like many other UTA stations, this station has artwork included in its design. The work of art for the Airport station is the fence separating the station from the roadway approaching the terminal. The yellow fence was built to have the appearance of a mountain skyline. It is called The Canyon and was designed by Gordon Huether of Napa, California.[6][7] Even though the station is located 6 miles (9.7 km) from Downtown Salt Lake City it is still much closer to the city center than most airports that serve major cities in the United States.[8] It takes about 20 minutes to travel from the Airport station to the downtown area.[9] The station is part of a railway right-of-way that was created specifically for the Green Line. The station opened on April 14, 2013, and is operated by the Utah Transit Authority.
As part of project to rebuild the airport terminal, the Airport TRAX station was torn down and rebuilt closer to the new terminal. To facilitate the new station, the tracks were extended by about 1500 feet. The total cost to relocate the station was $22 million, and the station reopened in the new location in October 2021.[10]
Notes
^ abUTA also lists 650 North 3700 West another address for the Airport Station. (Terminal Drive runs along the south side of the station and is the main approach roadway for incoming vehicular traffic for the airport. North 3700 West is a restricted access road that runs along the north side of the station.)[4]