Section
|
Description
|
Designed speed (km/h)
|
Length (km)
|
Construction start date
|
Open date
|
Top trip speed
|
Beijing–Hong Kong high-speed railway
|
HSR Corridor connecting North with Central China, consisting of 6 segments between Beijing, Shangqiu, Hefei, Jiujiang, Nanchang, Ganzhou, Shenzhen and Hong Kong.
|
350
|
|
2014-12-20
|
|
See below
|
Beijing–Shangqiu section (Beijing–Shangqiu high-speed railway)
|
HSR from Beijing Fengtai to Shangqiu
|
350
|
|
|
|
–
|
Shangqiu–Hefei section (Shangqiu–Hefei high-speed railway)
|
HSR from Shangqiu to Hefei
|
350
|
|
2015-11-30
|
2019-12-1
|
–
|
Hefei–Jiujiang Section[4] (Hefei–Jiujiang high-speed railway)
|
HSR from Hefei to Jiujiang
|
350
|
|
2015-12-25
|
2021-12-30
|
–
|
Jiujiang–Nanchang Section (Jiujiang–Nanchang high-speed railway)
|
HSR from Jiujiang to Nanchang
|
350
|
|
|
|
|
Nanchang-Ganzhou Section (Nanchang-Ganzhou high-speed railway)
|
HSR from Nanchang to Ganzhou
|
350
|
|
2014-12-20
|
2019-12-26
|
|
Ganzhou-Shenzhen Section (Ganzhou-Shenzhen high-speed railway)
|
HSR from Ganzhou to Shenzhen
|
350
|
|
2016-12-22
|
2021-12-10
|
|
Shenzhen–Hong Kong Section Mainland Portion (Guangzhou–Shenzhen–Hong Kong Express Rail Link)
|
HSR from Shenzhen to Futian
|
200
|
106
|
2005-12-18
|
2015-12-28
|
308
|
Guangzhou–Shenzhen–Hong Kong Section Hong Kong Portion (Guangzhou–Shenzhen–Hong Kong Express Rail Link)
|
HSR from Futian to West Kowloon
|
200
|
36 (26 km in Hong Kong)
|
2010-01-27[citation needed]
|
2018-09-23[5]
|
|