The span was constructed in 1884 and upgraded in 1915. It served the busy Wheeling division of the Baltimore and Ohio Railroad, which in 1928, operated an average of 19 freight and 12 passenger trains across the structure each day. After B&O was absorbed into CSX Transportation, this company ran local freight trains across the bridge; the short line Allegheny Valley Railroad has a long-term lease to manage this structure, which serves a route between its headquarters in an adjacent rail yard and Washington, Pennsylvania.