EndCrick
Operation
OwnerNetwork Rail
OperatorWest Coast Main Line
Technical
Track length2,216 m
No. of tracksTwo

The Kilsby Tunnel is a railway tunnel on the West Coast Main Line in England, near the village of Kilsby in Northamptonshire, roughly 5 miles (8 km) southeast of Rugby. It is 2,423 yards (2,216 m) long.

The Kilsby Tunnel was designed and engineered by Robert Stephenson for the London & Birmingham Railway (L&BR). It was constructed by contractors Joseph Nowell & Sons and later by the L&BR. It took much longer to construct and exceeded its estimated cost, attributed to a roof collapse and consequential flooding. At the time of its opening in 1838, it was the longest railway tunnel ever constructed.[1]

The tunnel had atypically large ventilation shafts, because of a lack of experience as to how much ventilation would be needed for steam locomotives to pass through.[1] On opening in 1838, the tunnel was single track and in 1879, double-track was laid. In March 1987, Kilsby Tunnel portals and its two ventilation shafts were given listed status.

History

Construction

In the 1830s, Robert Stephenson developed the London and Birmingham Railway (L&BR) (later known as the West Coast Main Line).[1] After opposition from several landowners and proprietors in Northampton in July 1832, the House of Lords rejected the original bill to authorise construction of the line. Stephenson surveyed an alternative route to the west of the town that included Kilsby Tunnel.[1] The 2,423 yard tunnel would be the world's longest railway tunnel. In May 1835, Joseph Nowell & Sons was awarded the tunnel contract, which was valued at £98,988 (equivalent to £12,310,000 in 2023).[2][1]

Construction proved to be less than straightforward.[1] Within months of work commencing, the second of the working shafts was flooded because of large amounts of quicksand not revealed by trial borings into the hill. Similar problems had been encountered during the construction of Blisworth Tunnel on the Grand Union Canal a few decades earlier.[1] Problems posed by the quicksand at tunnel level were so severe that abandoning the shaft and restarting work elsewhere was considered. Stress from the project was said to have caused Joseph Nowell's ill-health and death.[1]

At the recommendation of George Stephenson, several steam-powered pumps were installed to extract water from the quicksand inside the tunnel. The pumps removed up to 2,000 gallons of water from a depth of 120 feet every minute of operation and took up to eight months.[3] Seven more shafts were sunk to install timber cylinders to hold back the sand.[1] During this time, multiple attempts were made to construct the tunnel's brick lining using a raft to float men and materials into position. As a protective measure, the lining's thickness was increased from 18 inches to in excess of two feet and straw was used to deflect and control the ingress of water to prevent wet concrete from being washed away from newly laid bricks.[1]

One of the ventilation towers above the tunnel

An unusual feature of the tunnel is the size of its ventilation shafts, which were adapted from ten of the working shafts used during its construction.[1] In May 1836, work started on the first of two shafts, which were 132 feet deep and 20 yards in diameter. The shafts were sunk using sequentially dug trenches around the circumference and took over a year to reach the bottom of each shaft. Its three-foot-thick walls required over one million bricks and weighed an estimated 4,034 tonnes. For aesthetic reasons both shafts are castellated.[1]

Author Graeme Bickerdike has speculated that, while their size is excessive in regards to providing airflow, considerable importance was placed on overcoming public perceptions and worries over personal health due to insufficient ventilation, especially in regards to the use of steam locomotives inside lengthy tunnels. Several newspapers had negatively commented on the issues, and it is likely that Stephenson would have wanted to silence critics and assuage these sentiments by visibly demonstrating how much ventilation was being provided.[1]

Completion and subsequent activities

On 21 June 1838, resident engineer Charles Lean laid the final brick of the tunnel, marking its completion.[1] It took three years, and cost £320,000 to build, (equivalent to £36,390,000 in 2023)[2] three times the original estimate. The high accident rate in the course of its construction included the deaths of 26 of the 1,250 workers. The length of time it took to build delayed the opening of the L&BR.[1] On 20 August 1838, the directors of the L&BR conducted the first ever rail journey between Birmingham Curzon Street railway station and Euston railway station, London.[1] On the way, the train briefly stopped at the tunnel so that they could marvel at the structure and meet some of the workmen. Regular services using the tunnel commenced soon after.[1]

Drawing from 1839 of one of the tunnel portals shortly after opening.
South portal of the tunnel in 2005.

Kilsby Tunnel had been designed for double tracks, but opened with a single track.[4] During early operations, train movements were controlled by two policeman, one at either end of the tunnel, who signalled the presence of a train to each other, and only one train was allowed to enter the tunnel at a time. In June 1852, a fatal collision occurred between a ballast train and a coal train as a result of signals that were either not issued or were not received. In 1879, the single track was doubled.[4]

In March 1987, both the north and south portals of Kilsby Tunnel were Grade II* listed; furthermore, the two largest ventilation shafts were also listed, the north shaft being Grade II* listed while the south shaft was Grade II listed.[4] During the tunnel's service life, there have been no major problems or difficulties with the structure. During a survey conducted during the 2010s, it was found to be in a largely good condition.[1]

During the 2010s, Kilsby Tunnel was restored by Network Rail.[1] Maintenance focused on inspecting the ventilation shafts and repairs to the brickwork of one shaft was carried out, sections of the tunnel's lining were replaced. While unusual means of access were used because of the listed status of the shafts, the repairs were described as routine.[1]

At the beginning of 2020, an estimated 400 trains were using the tunnel daily. Due to the drastic reduction in rail traffic caused by the COVID-19 pandemic, Network Rail took the rare opportunity to close the tunnel for two weeks in May 2020 in order to carry out major works, including replacing much of the tunnel's drainage system, which had become clogged by heavily limed water seeping through, causing flooding problems, and also replacing much of the track and ballast. This was the longest total closure of the tunnel since it was opened, with all trains diverted temporarily via Northampton. In normal times the work would have required many short blockades, and taken months to complete. It allowed a temporary speed restriction through the tunnel of 70 mph to be lifted, enabling trains to operate at the normal line speed of 110 mph.[5][6]

See also

Other L&BR tunnels:

References

  1. ^ a b c d e f g h i j k l m n o p q r s t Bickerdike, Graeme (27 April 2018). "Stairway to heaven: shaft repairs at Kilsby tunnel". Rail Engineer. Retrieved 5 July 2020.
  2. ^ a b UK Retail Price Index inflation figures are based on data from Clark, Gregory (2017). "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)". MeasuringWorth. Retrieved 7 May 2024.
  3. ^ "Kilsby Tunnel". Spartacus Educational.
  4. ^ a b c "Kilsby Tunnel." engineering-timelines.com, Retrieved: 6 May 2018.
  5. ^ "Kilsby tunnel work planned in 10 days!". Rail Insider. 15 June 2020. Retrieved 5 July 2020.
  6. ^ "Longest tunnel closure since Victorian-era improves West Coast main line journey times". Network Rail. 18 May 2020. Retrieved 5 July 2020.
  • Kilsby Tunnel includes the classic image of the tunnel under construction.
  • A short video of an air shaft by Si Horton using data collected by Colin Humphreys using a Faro Focus X330 laser scanner (on YouTube)

Read other articles:

  باندا آتشيه (بالإندونيسية: Kota Banda Aceh)‏(بالإندونيسية: Kota Besar Kutaraja)‏    باندا آتشيه باندا آتشيه  خريطة الموقع الشعار (بالأتشينيزية: Saboeh Pakat Tabangun Banda)‏  تاريخ التأسيس 22 أبريل 1205  تقسيم إداري البلد إندونيسيا[1]  [2][3] عاصمة لـ آتشيه  التقسيم الأعلى آت

 

Untuk nama novel dengan judul yang sama seperti film ini, lihat 5 cm. 5 cmPoster filmSutradara Rizal Mantovani Produser Sunil Soraya Ditulis oleh Donny Dhirgantoro Sunil Soraya Hilman Mutasi SkenarioDonny DhirgantoroSunil SorayaHilman MutasiBerdasarkan5 cmoleh Donny DhirgantoroPemeranHerjunot AliRaline ShahFedi NurilPevita PearceDenny SumargoSaykojiPenata musikNidjiSinematograferYudi DatauPenyuntingSastha SunuPerusahaanproduksiSoraya Intercine FilmsTanggal rilis12 Desember 2012 (20...

 

 Nota: Para outros significados de Quaresma, veja Quaresma (desambiguação). Quaresma  Portugal2003 •  cor •  95 min  Género drama Direção José Álvaro Morais Produção Paulo Branco Roteiro José Álvaro MoraisJeanne Waltz Elenco Beatriz BatardaFilipe CaryRita Durão Música Bernardo Sassetti Diretor de fotografia Acácio de Almeida Direção de arte Isabel Branco Edição Christine Maffre Distribuição Medeia Filmes Lançamento 3 de outubro de 2003 Idioma ...

Montañas Entoto Vista de las montañas Entoto desde la ciudad de Adís Abeba.Ubicación geográficaContinente ÁfricaUbicación administrativaPaís Etiopía EtiopíaCaracterísticasCumbres Monte Entoto[editar datos en Wikidata] Las montañas Entoto o montañas de Entoto son una cadena montañosa ubicada al norte de Adís Abeba, ciudad del Macizo etíope, en la región central de Etiopía. Su principal cerro es el monte Entoto, el cual sirvió como capital de...

 

Ukrainische Meisterschaft 2004 Austragungsort: BK Bingo,Kiew, Ukraine Eröffnung: 27. Oktober 2004 Endspiel: 31. Oktober 2004 Sieger: Hryhorij Chymotschka Finalist: Bohdan Moltschanow  2005 → Die ukrainische Snooker-Meisterschaft 2004 war ein Snookerturnier, das vom 27. bis 31. Oktober 2004 im BK Bingo in der ukrainischen Hauptstadt Kiew stattfand.[1] Ukrainischer Meister wurde Hryhorij Chymotschka, der im Finale Bohdan Moltschanow mit 4:1 besiegte. Den dritten Platz belegt...

 

Loukas Vyntra Informasi pribadiNama lengkap Loukas VyntraTanggal lahir 05 Februari 1981 (umur 42)Tempat lahir Město Albrechtice, CekoslowakiaTinggi 1,84 m (6 ft 0 in)Posisi bermain BekInformasi klubKlub saat ini LevanteNomor 6Karier junior1998–1999 Almopos AridaiaKarier senior*Tahun Tim Tampil (Gol)1999–2000 Paniliakos 4 (0)2000–2001 Veria 24 (0)2001–2004 Paniliakos 63 (4)2004–2013 Panathinaikos 227 (10)2013– Levante 26 (0)Tim nasional‡1997–2005 Yunani U-21 20 ...

The Right ReverendSidney Catlin PartridgeBishop of West MissouriChurchEpiscopal ChurchDioceseWest MissouriElected1911In office1911-1930PredecessorEdward Robert AtwillSuccessorRobert Nelson SpencerOrdersOrdination1885by William Jones BooneConsecrationFebruary 2, 1900by John McKimPersonal detailsBorn(1857-09-01)September 1, 1857New York City, New York, U.S.DiedJune 22, 1930(1930-06-22) (aged 72)Kansas City, Missouri, U.S.BuriedForest Hill Calvary CemeteryKansas City, Missouri, U....

 

Jewish ethnic group from the Middle East Not to be confused with History of the Jews in Baghdad. Baghdadi JewsProminent Bagdadi Jewish patriarch David Sassoon (seated) and his sons Elias David, Albert (Abdullah), and Sassoon David SassoonTotal population5,000 Historical peak in 1940s[1]Regions with significant populationsIndia 100 (chiefly Mumbai and Calcutta) Israel, Britain, Canada, Australia, Singapore, Hong Kong, and the United States.LanguagesTraditionally Arabic, Persian, Judeo-...

 

2020 studio album by Donny BenétMr ExperienceStudio album by Donny BenétReleased22 May 2020LabelDot DashDonny Benét chronology The Don(2018) Mr Experience(2020) Le Piano(2022) Singles from Mr Experience Second DinnerReleased: 15 August 2019 Girl of My DreamsReleased: 22 January 2020 Mr ExperienceReleased: 30 April 2020 Mr Experience is the fifth studio album by Australian post-disco singer, Donny Benét. It was released in May 2020 and peaked at number 26 on the ARIA charts; his fi...

Grote Kerk Große Kirche Plaats Reformierter Kirchgang 17, 26789 Leer  Duitsland Denominatie Evangelisch-Hervormde Kerk (Landskerk) Coördinaten 53° 14′ NB, 7° 27′ OL Architectuur Architect(en) Isaak Wortmann Bouwmethode Barok Stijlperiode 1785-1787 Detailkaart Portaal    Christendom De Grote Kerk (Duits: Große Kirche) is een hervormde kerk in de Duitse stad Leer en het grootste kerkgebouw in de omgeving. Het gebouw is de hoofdkerk van de Evangelisch-Hervormde Ke...

 

Motor vehicle Dodge VenomOverviewTypeConcept Sports carBody and chassisBody style2 door coupeLayoutFront engine, Rear-Wheel DrivePowertrainEngine3.5L EGE SOHC V6Power output245 HPTransmission6-speed manualThe Dodge Venom was a concept car that was produced in 1994 by the American automaker Dodge.[1] The car was built on a modified version of the Chrysler PL platform that was used in the Dodge Neon.[2] The car was designed to showcase Dodge's Cab-Forward design in a t...

 

Iranian footballer Arash Dajliri Personal informationFull name Arash DajliriDate of birth (1999-01-19) January 19, 1999 (age 24)Place of birth Tonekabon, IranHeight 1.85 m (6 ft 1 in)Position(s) Right-back , Center-backTeam informationCurrent team Esteghlal Mollasani F.C.Number 41Youth career2015–2020 EsteghlalSenior career*Years Team Apps (Gls)2020–2022 Esteghlal 5 (0)2021–2022 → Havadar (loan) 8 (0)2023–2023 Naft Gachsaran 10 (0)2023– Esteghlal Mollasani F.C....

This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages) This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Vampira 1994 film – news · newspapers · books · scholar · JSTOR (September 2012) (Learn how and when t...

 

Untuk kegunaan lain, lihat Arakawa dan Arakawa. Arakawa 荒川区Distrik kota istimewa BenderaLambangLokasi Arakawa di Prefektur TokyoNegara JepangWilayahKantōPrefektur TōkyōPemerintahan • Wali kotaTaiichirō NishikawaLuas • Total10,2 km2 (39 sq mi)Populasi (Oktober 1, 2015) • Total212.264 • Kepadatan20,810/km2 (53,90/sq mi)Zona waktuUTC+9 (WSJ)Kode pos116-8501Simbol • PohonSakura• BungaRhododendron...

 

Men's national volleyball team representing Israel For the women's team, see Israel women's national volleyball team. IsraelAssociationאיגוד הכדורעף בישראלIsrael Volleyball AssociationConfederationCEVHead coachGrzegorz RyśFIVB ranking62 (as of 2 December 2023)Uniforms Home Away Summer OlympicsAppearances0World ChampionshipAppearances4 (First in 1952)Best result10thEuropean ChampionshipAppearances3 (First in 1951)Best result10thwww.iva.org.il (in Hebrew) The Israel men's nat...

Опис файлу Опис Джерело Автор зображення Ліцензія див. нижче У цього зображення немає: опису інформації про автора інформації про джерело Якщо ви маєте таку інформацію чи маєте до неї доступ, будь ласка, додайте її на сторінку опису зображення. Для сповіщення завантажува...

 

Beruang Hitam Himalaya Status konservasi Rentan (IUCN 3.1) Klasifikasi ilmiah Kerajaan: Animalia Filum: Chordata Kelas: Mamalia Ordo: Carnivora Famili: Ursidae Genus: Ursus Spesies: U. thibetanus Subspesies: U. t. laniger Nama trinomial Ursus thibetanus lanigerPocock, 1932 Sinonim Selenarctos thibetanus laniger Beruang hitam himalaya (Ursus thibetanus laniger, atau Selenarctos thibetanus laniger), adalah subspesies dari beruang hitam asia,[1] pertama kali diungkapkan ol...

 

Iranian film director Hamid Samandarianحمید سمندریانBorn(1931-05-06)May 6, 1931Tehran, PersiaDiedJuly 12, 2012(2012-07-12) (aged 81)Tehran, IranResting place88 Segment, Behesht-e Zahra CemeteryOccupation(s)Film director, theatre director, screenwriter, playwright, translatorSpouseHoma Rousta (m. 1972–2012, his death)ChildrenKaveh (born 1975) Hamid Samandarian Persian: حمید سمندریان; May 6, 1931 – July 12, 2012) was an Iranian film and theater director ...

Radio station in New York City For the company with the stock symbol WLTW, see Willis Towers Watson. This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages) This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: WLTW – news · newspapers...

 

Ministry in the Government of Singapore Ministry of TransportAgency overviewFormed23 November 2001; 22 years ago (2001-11-23)Preceding agencyMinistry of Communications and Information TechnologyJurisdictionGovernment of SingaporeHeadquarters460 Alexandra Road, #33-00 mTower, Singapore 119963MottoConnecting People and PossibilitiesEmployeesMOT Family: 8,825, MOT: 181 (March 2023)Annual budget S$10.68 billion (2019)[1]Ministers responsibleS. Iswaran, Minister[a]...

 
Kembali kehalaman sebelumnya