Metro line of the Hangzhou Metro system in China
Line 9 of the Hangzhou Metro (simplified Chinese: 杭州地铁九号线; traditional Chinese: 杭州地鐵九號線; pinyin: Hángzhōu Dìtiě Jiǔhào Xiàn) is a metro line in Hangzhou. The line is 29.45 km (18.30 mi) long and runs in a north–south direction between Guanyintang and Long'an.[1] The line is colored brown on system maps.
Opening timeline
Segment |
Commencement |
Length |
Station(s) |
Name
|
Coach Center — Linping
|
24 November 2012; 12 years ago (2012-11-24)[a] 10 July 2021; 3 years ago (2021-07-10)[b]
|
12.5 km (7.8 mi)[3]
|
7
|
Central section of Phase 1
|
Linping — Long'an
|
17 September 2021; 3 years ago (2021-09-17)[4]
|
6.2 km (3.9 mi)[5]
|
4
|
North section of Phase 1
|
Guanyintang — Coach Center (except Liubao and Wubao)
|
1 April 2022; 2 years ago (2022-04-01)[6][7]
|
12 km (7.5 mi)[6]
|
10
|
South section of Phase 1
|
Liubao and Wubao
|
14 December 2022; 23 months ago (2022-12-14)[8]
|
|
2
|
Infill stations
|
Stations
- Legend
- Operational
- Under construction
Rolling stock
Stock
|
Class
|
Year built
|
Builder
|
Number built
|
Numbers
|
Formation
|
Depots
|
Line assigned
|
Notes
|
PM145
|
B
|
2020-2022
|
CRRC Nanjing Puzhen
|
186 (31 sets)
|
09 001 - 09 031 (090011-090316)
|
Tc+Mp+M+M+Mp+Tc
|
Changda Road Depot Sibao Yard
|
9
|
|
See also
References
|
---|
Line 9 | |
---|
Note: Stations in Italic are in construction or planning. |