This train had its inaugural run on 11 March 2012 as train number 01093 from Lokmanya Tilak Terminus to Prayagraj Junction. Regular services commenced on 13 March 2012 as train no. 12294 & on 16 March 2012 as train no. 12293. It is a fully AC train & previously it used refurbished ICFRajdhani Coaches.
Technical stoppages
Being a Duronto Express train, it had no commercial halts between its terminal stops. However, later many of its technical halts are converted into commercial halts because of low response to Duronto Express trains. This train (12293) has 4 commercial halts & 3 technical halts, at Kasara, Igatpuri, Bhusawal Junction, Itarsi Junction, Jabalpur Junction, Itarsi Junction, Katni Junction and Satna. It takes 7 minutes at Kasara for addition of banker engine for the run through the ghats, Igatpuri of about 5 minutes for the removal of bankers, at Bhusaval of about 5 minutes for crew change, Itarsi for 20 minutes for locomotive change, Satna Junction for 10 mins for breakfast pick up.
12293 Down Mumbai LTT–Prayagraj AC Duronto Express
Station code
Station name
Arrival
Departure
LTT
Lokmanya Tilak Terminus
Starting station
Monday, Friday
PRYJ
Prayagraj Junction
Tuesday, Saturday
Arrival station
12294 UP Prayagraj–Mumbai LTT AC Duronto Express
Station code
Station name
Arrival
Departure
PRYJ
Prayagraj Junction
Starting station
Tuesday, Saturday
LTT
Lokmanya Tilak Terminus
Sunday, Wednesday
Arrival station
Coaches
The Mumbai–Prayagraj Duronto Express has one AC 1st Class coach, three AC 2 tier class coaches, one pantry cars, two luggage-cum-generator coaches & up to eight AC 3 tier coaches taking the total up to 15 coaches.[1]
Loco
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
EOG
B8
B7
B6
B5
B4
B3
B2
B1
PC
H1
A3
A2
A1
EOG
12294 is the reverse composition of the above 12293.
B- Three Tier AC Sleeper (Third AC), A- Two Tier AC Sleeper (Second AC), H- AC First class cabins (First AC), PC-Pantry (Hot buffet) car, EOG/GV-Generator van cum Guard van