Share to: share facebook share twitter share wa share telegram print page

Royd Moor Wind Farm

Royd Moor Wind Farm
Map
CountryEngland
Location6 km west of Penistone, Barnsley South Yorkshire
Coordinates53°32′15″N 1°41′18″W / 53.53750°N 1.68833°W / 53.53750; -1.68833
Commission date1993
OwnerE.ON
Power generation
Units operational13 AN Bonus 450/37 turbines
Nameplate capacity6 MW
External links
CommonsRelated media on Commons

The Royd Moor Wind Farm is located at Penistone, Barnsley, South Yorkshire, England, and consists of thirteen 450 kW turbines. The site is located approximately 6 kilometres (3.7 mi) north west of Penistone, above the A628 trunk road between Barnsley and Manchester. The turbines are set in two parallel, staggered rows of six and seven,[1] on a ridge in hilly fell land lying 320 metres (1,050 ft) above sea level.

These turbines were completed in 1993 and are 35 metres (115 ft) in height to the hub and have a rotor diameter of 37 metres (121 ft). The maximum output is 6 mW, equivalent to the annual energy required to power 3,300 homes.[2]

The original planning application was for a 25-year operation but an extension until the end of 2027 was granted in 2021.[3]

References

  1. ^ "E.ON UK - Royd Moor". www.eon-uk.com. Archived from the original on 3 January 2010. Retrieved 11 March 2009.
  2. ^ "The OPET Network - Technical Sheet of THERMIE Project Renewables - Wind Energy (RWE-10)". cordis.europa.eu. Archived from the original on 14 March 2012. Retrieved 11 March 2009.
  3. ^ https://wwwapplications.barnsley.gov.uk/PlanningExplorerMVC/Home/ApplicationDetails?planningApplicationNumber=2021%2F0157 [bare URL]


Kembali kehalaman sebelumnya