The original regional bus terminal opened in 1985 adjacent to the Line 3 station but was relocated to a temporary on-street terminal on Borough Drive starting October 1, 2022. Line 3 is expected to close permanently in 2023 and be replaced with TTC bus service until the Scarborough extension of Line 2 Bloor–Danforth opens for revenue service, expected in 2030. The TTC required more space to handle replacement buses and required GO Transit and intercity buses to vacate the original terminal. A new Scarborough Centre Bus Terminal is expected to be completed in 2030 east of Scarborough Town Centre as part of the planned new Scarborough Centre station. The future bus terminal will also be the western terminal of the proposed Durham–Scarborough bus rapid transit corridor.[1][2][3]
Opened in 1985, the regional bus terminal was originally located adjacent to Scarborough Centre station on Line 3 Scarborough of the Toronto subway. With the expected closure of Line 3 in 2023 and its replacement by TTC bus service until about 2030, the TTC needed the terminal space for its own buses. Thus, GO Transit and intercity buses had to vacate the original location so that the area could be reconfigured for more TTC buses.[1][2] On October 1, 2022, the regional bus terminal was relocated to Borough Drive on the west side of Scarborough Town Centre.[8]
Temporary terminal (2022–2030)
On October 1, 2022, a temporary on-street terminal opened, replacing the original bus terminal. The temporary terminal has six bus bays located on the east side of Borough Drive between Progress Avenue and Triton Road. The terminal location is near the west side of Scarborough Town Centre shopping mall. TTC bus routes 21 Brimley and 43 Kennedy have stops within 50 to 250 metres (160 to 820 ft) from the temporary terminal.[8] This temporary terminal will be replaced by a future terminal expected to open in 2030.[3]
Future terminal (from 2030)
A new Scarborough Centre Bus Terminal is expected to open in 2030 east of Scarborough Town Centre as part of the planned new Scarborough Centre station on the Scarborough extension of Line 2 Bloor–Danforth. It will be adjacent to a new Scarborough Centre station, which will be located on the east side of McCowan Road, north of the Line 3 right-of-way next to the site of McCowan station.[3] The new bus terminal will also be the western terminal of the proposed Durham–Scarborough bus rapid transit corridor.[1][2][3]