Sumner Tunnel

Sumner Tunnel
Exit from the tunnel in Downtown Boston
Overview
LocationBoston, Massachusetts
Coordinates42°22′05″N 71°2′47″W / 42.36806°N 71.04639°W / 42.36806; -71.04639
StatusOpen
Route
Route 1A south
StartEast Boston
EndDowntown Boston
Operation
ConstructedMarch 30, 1931 – June 30, 1934
OpenedJune 30, 1934; 90 years ago (June 30, 1934)
OwnerCommonwealth of Massachusetts
OperatorMassachusetts Department of Transportation
TrafficAutomotive
TollBetween $0.20 and $2.05 depending on payment method and residency[1]
Technical
Length1.079 mi (1.736 km)
No. of lanes2
Operating speed40 mph (64 km/h)
Tunnel clearance12.6 ft (3.8 m)
Width22.2 ft (6.8 m)

The Sumner Tunnel is a road tunnel in Boston, Massachusetts, United States. It carries traffic under Boston Harbor in one direction, from Logan International Airport and Route 1A in East Boston. The tunnel originally deposited traffic at the west side of the North End, but with the completion of the Big Dig, it was modified to have two exits. One exit connects to I-93 northbound and downtown Boston (Government Center) near Haymarket Station. The other exit connects to Storrow Drive and Nashua St., connecting Cambridge via Route 28. Traffic headed for I-93 southbound and the Massachusetts Turnpike (I-90) westbound is normally routed to the Ted Williams Tunnel. It is managed by the Massachusetts Department of Transportation.[2]

History

The Sumner Tunnel was opened on June 30, 1934. It carried traffic in both directions until the opening of the parallel Callahan Tunnel in 1961. The Sumner Tunnel is named for William H. Sumner, the son of Governor Increase Sumner.[3]

Until 2009, it was managed by the Massachusetts Turnpike Authority, when it was transferred to the Massachusetts Department of Transportation.[2]

As of 2016, a toll of $1.50 is charged for non-commercial two-axle vehicles with a Massachusetts E-ZPass, while non-Massachusetts E-ZPass holders are charged $1.75. Vehicles without E-ZPass are charged $2.05 through MassDOT's Pay by Plate MA program. For residents of certain Boston ZIP Codes, a discount is in effect using an E-ZPass transponder, costing $0.20. On November 14, 2008, the Massachusetts Turnpike Authority voted in favor of a proposed toll hike which would double the toll to $7.00 for non-commercial vehicles (at the time, the toll was $3.50 in the southbound direction only). E-ZPass users would receive a $1.00 discount and commercial vehicles would end up having to pay $9.00. This vote was later rescinded following a vote approving a 1.25% sales tax increase.

In 2016, cashless tolling systems were installed in both directions, entering the Sumner Tunnel and exiting the Callahan Tunnel as part of a plan to modernize toll collection in the Boston area.[4]

The tunnel has been shut intermittently for modernization from summer 2022 through summer 2024. It will be fully closed from July 5 and August 5, 2024, and on weekends from August 9 through November 15, except for August 30 and October 11.[5][6]

See also

References

  1. ^ "Toll Rates". EZDRIVEMA. Retrieved December 2, 2016.
  2. ^ a b "Close-Out Audit of Agencies and Authorities Combined into the Massachusetts Department of Transportation". Commonwealth of Massachusetts: Office of the State Auditor. Retrieved July 3, 2024.
  3. ^ "Ask the Globe; Q. Who Was William Sumner, for Whom the Sumner Tunnel Was Named?". Boston Globe. July 26, 1981 – via Proquest.
  4. ^ McKeever, Jim (October 27, 2016). "Big changes on the Mass. Pike: Everything you need to know". Fox 61. Retrieved July 12, 2023.
  5. ^ "Sumner Tunnel Restoration: Project details and closure schedule". Massachusetts Department of Transportation: MassDOT Projects and Studies: Sumner Tunnel. Retrieved July 3, 2024.
  6. ^ Sweeney, Emily (May 9, 2022). "'It's going to have a major impact': Boston neighborhoods brace for Sumner Tunnel construction, closures". Boston Globe. Retrieved July 11, 2023.
Kembali kehalaman sebelumnya