Share to: share facebook share twitter share wa share telegram print page

Third Avenue station (BMT Canarsie Line)

 3 Avenue
 "L" train
New York City Subway station (rapid transit)
Southbound platform with L train in the distance
Station statistics
AddressThird Avenue & East 14th Street
New York, New York
BoroughManhattan
LocaleEast Village, Stuyvesant Square
Coordinates40°44′00″N 73°59′14″W / 40.733243°N 73.987212°W / 40.733243; -73.987212
DivisionB (BMT)[1]
Line   BMT Canarsie Line
Services   L all times (all times)
TransitBus transport NYCT Bus: M14A SBS, M14D SBS, M101, M102, M103
StructureUnderground
Platforms2 side platforms
Tracks2
Other information
OpenedJune 30, 1924; 100 years ago (1924-06-30)
Opposite-
direction
transfer
No
Traffic
20231,564,084[2]Increase 8%
Rank209 out of 423[2]
Services
Preceding station New York City Subway New York City Subway Following station
Union Square First Avenue
Location
Third Avenue station (BMT Canarsie Line) is located in New York City Subway
Third Avenue station (BMT Canarsie Line)
Third Avenue station (BMT Canarsie Line) is located in New York City
Third Avenue station (BMT Canarsie Line)
Third Avenue station (BMT Canarsie Line) is located in New York
Third Avenue station (BMT Canarsie Line)
Track layout

Street map

Map

Station service legend
Symbol Description
Stops all times Stops all times

The Third Avenue station is a station on the BMT Canarsie Line of the New York City Subway. Located at the intersection of Third Avenue and East 14th Street in East Village, Manhattan,[3][4] it is served by the L train at all times.

History

Contract 4 of the Dual Contracts, adopted on March 4, 1913 between New York City and the Brooklyn Rapid Transit Company, included a subway route under 14th Street, to run to Canarsie in Brooklyn; this became the BMT's Canarsie Line.[5]: 203–219 [6]

Booth and Flinn was awarded the first contract for the line, namely a tunnel under the East River, in January 1916.[7] At the time, the Public Service Commission was completing plans for the rest of the line;[8] the commission began accepting bids for two parts of the line within Manhattan, sections 1 and 2. in April 1916.[9] The next month, Booth and Flinn won the contract for section 1, which was to cost $2.528 million (equivalent to $70.784 million in 2023).[10] By early 1919, the section of the line under 14th Street was about 20 percent completed.[11]

In 1922, the Charles H. Brown & Son Corporation was contracted to build out the Canarsie Line's stations in Manhattan, including the Third Avenue station.[12] Track-laying in the tunnels between Sixth and Montrose Avenues started in the last week of October 1922.[13][14] The Third Avenue station at Union Square opened on June 30, 1924, as part of the 14th Street–Eastern Line, which ran from Sixth Avenue under the East River and through Williamsburg to Montrose and Bushwick Avenues.[15][16]

Station layout

Entrance to the station
Ground Street level Exit/entrance
Platform level Side platform
Westbound "L" train toward Eighth Avenue (Union Square)
Eastbound "L" train toward Canarsie–Rockaway Parkway (First Avenue)
Side platform

This station has two side platforms, which are 500 feet (150 m) long, and two tracks. West of the station, there is a double crossover.[17] The platforms are column-less and have the standard BMT style trim-line and name tablets. The former contains "3" tablets in standard intervals, while the latter consists of "THIRD AVE" in seriffed lettering.

There are also directions signs to the station's only entrances/exits saying "TO STREET" in the same style as the name tablets. Each platform has its own same-level fare control at the extreme west (railroad north) end. As a result, there is no free transfer between directions.

Third Avenue is one of only two stations along the Canarsie Line in Manhattan that does not contain a transfer to another line. The other station is the nearby First Avenue Subway station. However, a transfer station is planned to the 14th Street station of the Second Avenue Subway, as part of Phase 3 of the line's construction from 55th Street to Houston Street.[18]

Exits

Each platform-level fare control area has a bank of turnstiles, token booth, and two street stairs apiece—one to the east side of Third Avenue and East 14th Street, the other to East 14th Street just east of Third Avenue. The stairs on the Eighth Avenue-bound side lead to the northeast corner, while the ones on the Brooklyn-bound side lead to the southeast corner.[4]

Experimental platform doors

As part of a pilot program, each platform at the Third Avenue station was supposed to be refitted with 32 half-height platform screen doors (PSDs) while the 14th Street Tunnel was being rebuilt from April 2019 to March 2020. This had been possible as a result of the L train's automated train operation, as well as the route's exclusive use of 60-foot-long (18 m) subway cars with four doors, which allow trains to stop at the same part of the platform every time. The MTA would have used the results of the pilot in order to determine the feasibility of adding such doors citywide.[19] The PSDs would have been approximately 54 inches (140 cm) high and would have been coordinated with the location of the subway car doors when a train was in the station.[20]

To ensure that the subway car is precisely lined up with the doors, a wayside-only berthing system would be installed. Emergency egress gates would be installed in between the regular doors to allow people to exit in the case of an emergency. The platform edges and topping would be removed and replaced so that they align with the sills of the train doors and to be in compliance with the Americans with Disabilities Act of 1990. To ensure that people do not get trapped in between the subway car doors and the PSDs, sensors and CCTV cameras would be installed with monitors at the center and front of the platforms visible to the train operator and conductor.[21]

In June 2018, the $30 million for the platform edge door pilot program was diverted to another project along the Canarsie Line: the installation of elevators at the Sixth Avenue station. The pilot program was postponed until sufficient funding could be found.[22] In February 2022, the MTA announced that the PSD installation at Third Avenue would proceed as part of a pilot program involving three stations.[23][24] The announcement came after several people had been shoved onto tracks, including one incident that led to a woman's death at another station.[24] The MTA started soliciting bids from platform-door manufacturers in mid-2022;[25] the doors are planned to be installed starting in December 2023 at a cost of $6 million.[26] Designs for the platform doors were being finalized by June 2023.[27][28]

References

  1. ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  2. ^ a b "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
  3. ^ "East Village, Manhattan Senior Pedestrian Crashes 2001-2006" (PDF). nyc.gov. Archived from the original (PDF) on June 26, 2022.
  4. ^ a b "MTA Neighborhood Maps: East Village" (PDF). Metropolitan Transportation Authority. 2015. Retrieved August 6, 2015.
  5. ^ Walker, James Blaine (1918). Fifty Years of Rapid Transit — 1864 to 1917. New York, N.Y.: Law Printing. Retrieved November 6, 2016.
  6. ^ "Subway Contracts Solemnly Signed; Cheers at the Ceremonial Function When McCall Gets Willcox to Attest" (PDF). The New York Times. March 20, 1913. ISSN 0362-4331. Archived (PDF) from the original on May 4, 2022. Retrieved January 11, 2018.
  7. ^ "East River Tunnel Contract Awarded; Booth & Flinn, Who Will Do the Work for $6,639,023, to Use the Shield Method". The New York Times. January 14, 1916. ISSN 0362-4331. Archived from the original on July 27, 2018. Retrieved July 16, 2023.
  8. ^ "Public Service Commission Promises to Complete Contract Awards This Year". The Brooklyn Daily Eagle. January 16, 1916. p. 40. Archived from the original on July 16, 2023. Retrieved July 16, 2023 – via Newspapers.com.
  9. ^ "E. D. Tube Trains Will Run in 1918". Times Union. Brooklyn. April 8, 1916. p. 15. Archived from the original on July 16, 2023. Retrieved July 16, 2023 – via Newspapers.com.
  10. ^ "Award Subway Contracts". Times Union. Brooklyn. May 26, 1916. p. 6. Archived from the original on July 16, 2023. Retrieved July 16, 2023 – via Newspapers.com.
  11. ^ "When Will Dual Subway Be Finished?: Completed Work Cost 188,332,000--unfinished Contracts Amount to 20,000,000 Two Bodies Responsible for Construction Lack Mutual Confidence and Team-work". New-York Tribune. January 5, 1919. p. D10. ISSN 1941-0646. ProQuest 575999620.
  12. ^ "Long Delayed E. D. Transit Relief Move Announced". The Standard Union. Brooklyn. October 29, 1922. pp. 9, 11. Archived from the original on June 11, 2021. Retrieved June 11, 2021 – via Newspapers.com.
  13. ^ "Laying of Tracks Starts New Action for Thru Tubes". The Chat. Brooklyn. November 4, 1922. p. 18. Archived from the original on June 11, 2021. Retrieved June 11, 2021 – via Newspapers.com.
  14. ^ "Long Delayed E. D. Transit Relief Move Announced". The Standard Union. Brooklyn. October 29, 1922. pp. 9, [1]. Archived from the original on July 17, 2023. Retrieved July 16, 2023 – via Newspapers.com.
  15. ^ "Celebrate Opening of Subway Link" (PDF). The New York Times. July 1, 1924. p. 23. Retrieved February 13, 2010.
  16. ^ "Pushing Throng Christens Spur Of B. M. T. Tube: Hylan Runs the First Train From Brooklyn to 14th Street, Then Assails "Interests'" at Luncheon Yearns to Boss System Transit Commission Heads Remind Mayor Epithets Won't Solve Problems". The New York Herald, New York Tribune. July 1, 1924. p. 12. ISSN 1941-0646. ProQuest 1112998377.
  17. ^ Dougherty, Peter (2006) [2002]. Tracks of the New York City Subway 2006 (3rd ed.). Dougherty. OCLC 49777633 – via Google Books.
  18. ^ "Figure 2-1 New York City Subway Service with Second Avenue Subway Line" (PDF). mta.info. Metropolitan Transportation Authority. Retrieved June 5, 2016.
  19. ^ Barone, Vin (October 24, 2017). "Platform door pilot heads to L train station". am New York. Retrieved October 25, 2017.
  20. ^ "New York City Transit and Bus Committee Meeting" (PDF). Metropolitan Transportation Authority. December 13, 2017. p. 145. Archived from the original (PDF) on December 28, 2017. Retrieved November 9, 2017.
  21. ^ "C-32518: Design, Build, Furnish & Maintain a Platform Barrier Door System at the 3rd Avenue Station on the Canarsie Line, Borough of Manhattan" (PDF). mta.info. Metropolitan Transportation Authority. February 20, 2018. Archived from the original (PDF) on March 16, 2018. Retrieved March 15, 2018.
  22. ^ Berger, Paul (June 26, 2018). "MTA Postpones Platform-Safety Pilot Program". Wall Street Journal. ISSN 0099-9660. Retrieved June 26, 2018.
  23. ^ Gold, Michael (February 23, 2022). "Subway Will Test Platform Doors at 3 Stations". The New York Times. ISSN 0362-4331. Retrieved February 23, 2022.
  24. ^ a b Brosnan, Erica (February 23, 2022). "MTA: Platform barrier pilot program to launch in three stations". Spectrum News NY1 | New York City. Retrieved February 23, 2022.
  25. ^ Martinez, Jose; Pedraza, Candace (July 15, 2022). "MTA Opens Door to Platform Barriers in Three Subway Stations". The City. Retrieved October 6, 2022.
  26. ^ "Project Details: Platform Screen Doors (PSD) Pilot: 3 Stations". MTA. Retrieved October 6, 2022.
  27. ^ Heyward, Giulia (June 4, 2023). "MTA set to install protective platform doors at select subway stations in 'coming months'". Gothamist. Retrieved June 5, 2023.
  28. ^ Troutman, Matt (June 5, 2023). "Three NYC Subway Stations Will Get Platform Doors: Report". New York City, NY Patch. Retrieved June 5, 2023.

Read other articles:

Iván Ferreiro Ferreiro en concierto, 2017Información personalNombre de nacimiento Iván Ferreiro RodríguezNacimiento 14 de agosto de 1970 (53 años)Nigrán (España) Nacionalidad EspañolaInformación profesionalOcupación Cantante y compositor de canciones Años activo 1991 – presenteInstrumento Voz Tipo de voz BarítonoArtistas relacionados Los Piratas Amaro FerreiroSitio web www.ivanferreiro.es [editar datos en Wikidata] Iván Ferreiro Rodríguez (Vigo,[1]​ 14 de ...

 

 

Anthony Richard Morrell Tony Little FRSA (born 1954, Hillingdon)[1] is a British schoolmaster.[2] Little spent seven years as housemaster of Brentwood School, seven years as the headmaster of Chigwell School, six years as headmaster of Oakham School, and 13 years as Head Master of Eton College.[3] From 2015 to 2018 he was Chief Education Officer of GEMS Education responsible for ensuring the quality of education across the global chain.[4] From September 2018 h...

 

 

У этого термина существуют и другие значения, см. Боржоми. Эта статья описывает ситуацию применительно лишь к одному региону, возможно, нарушая при этом правило о взвешенности изложения. Вы можете помочь Википедии, добавив информацию для других стран и регионов. Боржоми �...

Ungku Abdul Aziz Ungku Abdul HamidWakil Kanselir Universitas Malaya ke-3Masa jabatanOktober 1968 – Februari 1988PendahuluJ. H. E. GriffithsPenggantiSyed Hussein Alatas Informasi pribadiLahirUngku Abdul Aziz bin Ungku Abdul Hamid(1922-01-28)28 Januari 1922London, InggrisMeninggal15 Desember 2020(2020-12-15) (umur 98)Prince Court Hospital, Kuala Lumpur, MalaysiaMakamPemakaman Muslim Bukit Kiara, Kuala Lumpur, MalaysiaKebangsaanInggris, MalaysiaSuami/istriSharifah Azah Mohamed Al...

 

 

劇場版 NARUTO -ナルト- ブラッド・プリズン監督 むらた雅彦脚本 東山彰良出演者 竹内順子音楽 高梨康治刃-yaiba-主題歌 遊助「雄叫び」製作会社 劇場版NARUTO製作委員会配給 東宝公開 2011年7月30日上映時間 108分製作国 日本言語 日本語興行収入 8億4000万円[1]前作 劇場版 NARUTO -ナルト- 疾風伝 ザ・ロストタワー次作 ROAD TO NINJA -NARUTO THE MOVIE-テンプレートを表示 『劇場版 ...

 

 

ФітільєFitilieu Країна  Франція Регіон Овернь-Рона-Альпи  Департамент Ізер  Округ Ла-Тур-дю-Пен Кантон Ле-Пон-де-Бовуазен Код INSEE 38165 Поштові індекси 38490 Координати 45°32′51″ пн. ш. 5°33′43″ сх. д.H G O Висота 280 - 407 м.н.р.м. Площа 10,01 км² Населення 1754 (2011-01-01) Густота 175,22...

Canadian politician Lucille CollardMPPCollard in 2020Member of the Ontario Provincial Parliamentfor Ottawa—VanierIncumbentAssumed office February 27, 2020Preceded byNathalie Des RosiersConseil des écoles publiques de l'Est de l'Ontario School TrusteeIn officeDecember 1, 2010 – February 27, 2020Preceded byDenis ChartrandSucceeded byWarsama Abdourahman AdenConstituencyWard 12 Personal detailsPolitical partyLiberalResidence(s)Vanier, Ontario, Canada[1]OccupationPolitici...

 

 

En Paraguay, el sistema de gobierno adoptado es una República presidencial, lo cual implica que el presidente de la República desempeña simultáneamente el rol de jefe de Estado y jefe de Gobierno. Como resultado, el presidente cuenta con amplias atribuciones, incluyendo la facultad de designar a los ministros de Estado, así como supervisar a un cuerpo significativo de funcionarios que colaboran en la administración estatal. La estructura de la República del Paraguay, establecida como u...

 

 

Ekonomi VietnamHo Chi Minh City adalah pusat keuangan Vietnam.Mata uangđồng VietnamTahun fiskalTahun kalenderOrganisasi perdaganganAFTA, WTO, APEC, ASEAN, FAOStatistikPDB$219.379 milyar (2016, nominal)[1] $594.9 milyar (2016, PPP)[1]Pertumbuhan PDB 6.1% (2016) [2]PDB per kapita$2,371 (2016, nominal)[1] $6,377 (2016, PPP)[1]PDB per sektorPertanian: 17%, industri: 39%, jasa: 44% (2016 est.)[3]Inflasi (IHK) 2.8% (2016)[3]Pendudukdi bawah...

Untuk lagu asli yang dibawakan oleh AKB48 dan dirilis pada tahun 2010, lihat Ponytail to Shushu. Halaman ini berisi artikel tentang lagu JKT48 yang bertemakan tentang musim panas. Untuk lagu yang sebelumnya dibawakan oleh Tim J dan terdapat dalam trek ke-3 yang telah dirilis pada tahun 2013, lihat Heavy Rotation (album JKT48). Untuk lagu yang sebelumnya dibawakan oleh anggota JKT48 formasi Era Baru dengan versi gelap yang telah dirilis pada tahun 2021, lihat Cara Ceroboh untuk Mencinta. Ponyt...

 

 

Soviet canoeist Aleksandr SilayevAleksandr Silayev at the 1960 OlympicsPersonal informationBorn2 April 1928Moscow, Russian SFSR, Soviet UnionDied31 December 2005 (aged 77)Moscow, RussiaHeight1.87 m (6 ft 2 in)Weight78 kg (172 lb)SportSportCanoe racingClubDynamo Moscow Medal record Representing the  Soviet Union Olympic Games 1960 Rome C-1 1000 m World Championships 1958 Prague C-2 10000 m Aleksandr Silayev (2 April 1928 – 31 December 2005) was a Russian sprint ...

 

 

Repubblica L'ingressoStazione dellametropolitana di Roma GestoreATAC Inaugurazione1980 Statoin uso Linea Localizzazionepiazza della Repubblica, Castro Pretorio, Roma Tipologiastazione sotterranea, passante, con due binari e relative banchine in due canne parallele Interscambiofilobus urbaniautobus urbani DintorniTeatro dell'OperaFontana delle NaiadiQuirinaleS. Maria degli AngeliTerme di DioclezianoS. Bernardo alle Termevia Venti Settembrevia Nazionale Accessibilità inaccessibile alle persone...

Max Planck Institute for Human Cognitive and Brain Sciences in Leipzig The Max Planck Institute for Human Cognitive and Brain Sciences is located in Leipzig, Germany.[1] The institute was founded in 2004 by a merger between the former Max Planck Institute of Cognitive Neuroscience in Leipzig and the Max Planck Institute for Psychological Research in Munich.[2] It is one of 86 institutes in the Max Planck Society (Max Planck Gesellschaft).[3][4] Departments [...

 

 

Location of Kyiv Peninsula in Graham Land, Antarctic Peninsula. Valiente Peak (65°27′S 63°43′W / 65.450°S 63.717°W / -65.450; -63.717) is a peak (2,165 m) on Kyiv Peninsula on the west coast of Graham Land, standing close north of the mouth of Lever Glacier where the latter enters Beascochea Bay. It was discovered by the French Antarctic Expedition, 1908–10, under Charcot and named by him Sommet Saens Valiente, probably for Captain J.P. Saenz Valiente of Arge...

 

 

2020 video game 2020 video gamePersona 5 StrikersDeveloper(s)Omega ForceP-StudioPublisher(s)SegaDirector(s)Mumon UsudaDaisuke KanadaProducer(s)Daisuke KanadaKenichi OgasawaraDesigner(s)Takaaki OgataProgrammer(s)Tatsuto TsuchishitaArtist(s)Shigenori SoejimaWriter(s)Takaaki OgataToru YorogiYusuke NittaComposer(s)Atsushi KitajohGota MasuokaAyana HiraHiromu AkabaSeriesPersonaDynasty WarriorsPlatform(s)Nintendo SwitchPlayStation 4WindowsReleaseSwitch, PS4JP: February 20, 2020WW: February 23, 2021W...

Public research university in Cardiff, Wales Cardiff UniversityWelsh: Prifysgol CaerdyddCoat of arms of Cardiff UniversityFormer names University College of South Wales and Monmouthshire (1893–1972) University College, Cardiff (1972–1988) University of Wales College, Cardiff (1988–1996) University of Wales, Cardiff (1996–2005) MottoWelsh: Gwirionedd, Undod a Chytgord[1]Motto in EnglishTruth, Unity and Concord[1]TypePublicEstablished 1883 (college) 2005 (independen...

 

 

Theofilus AllorerungBupati Tana Toraja periode 2021—Bupati Tana Toraja ke-13 dan ke-15PetahanaMulai menjabat 26 Februari 2021PresidenJoko WidodoGubernurNurdin Abdullah Andi Sudirman Sulaiman Bahtiar Baharuddin (Pj.)WakilZadrak TombegPendahuluNicodemus BiringkanaeSemuel Tande Bura (Plh.)Masa jabatan27 September 2010 – 27 September 2015PresidenSusilo Bambang YudhoyonoJoko WidodoGubernurSyahrul Yasin LimpoWakilAdelheid SosangPendahuluJohanis Amping SituruPenggantiNicodemus B...

 

 

山謬·芬奇山謬·芬奇男演员英文名Samuel Finzi国籍 保加利亚 德國民族猶太裔出生 (1966-01-20) 1966年1月20日(57歲)保加利亞普羅夫迪夫职业演员、電影演員语言保加利亞语、德語配偶索蕾兒·雅典娜·渣甸(Sorrel Athina Jardine)儿女2代表作品《紅酒燉香雞(英语:Kokowääh)》、《紅酒燉香雞 2 香檳雞(英语:Kokowääh 2)》、《集體婚禮(德语:Die Hochzeit (2020))》活跃年代1...

Chief of Bhangi Misl Jhanda Singh DhillonChief of Bhangi MislReign1766—1774SuccessorGanda Singh DhillonDied1774FatherHari Singh Dhillon[1] The Jhanda Bunga of Amritsar, built by Jhanda Singh Dhillon of the Bhangi Misl, now demolished. Jhanda Singh Dhillon (died 1774) was a Chief of Bhangi Misl[2]Under his leadership the Dhillon family became the dominant de facto ruling power of Punjab. His father was Hari Singh Dhillon, one of the most powerful Sikh warriors of the time. ...

 

 

This article is an orphan, as no other articles link to it. Please introduce links to this page from related articles; try the Find link tool for suggestions. (July 2023) Enemies and Friends: The United Front in Chinese Communist History is a 1967 book by Lyman P. Van Slyke, published by Stanford University Press. It discusses the Chinese Communist Party (CCP). Background The author did much of his research towards this book at University of California, Berkeley. Van Slyke used documents, whi...

 

 

Kembali kehalaman sebelumnya