West Apaum sailed on three voyages for the US Navy, two after the Armistice, before she was decommissioned in July 1919. Though little is available regarding West Apaum's civilian career, it is known that she was sailing on a New York – Rotterdam route in early 1927. By early 1929, West Apaum had been laid up by the USSB, which abandoned her in 1933. The cargo ship was scrapped in the second quarter of that same year.
Design and construction
The "West" ships were cargo ships of similar size and design built by several shipyards on the West Coast of the United States for the United States Shipping Board for emergency use during World War I. All were given names that began with the word "West", like West Apaum,[6] one of some 24 "West" ships built by Skinner & Eddy of Seattle, Washington.[1][Note 1]
West Apaum (Skinner & Eddy No. 23, USSB No. 88)[1] was laid down on 19 March 1918, launched on 23 May, and delivered to the Navy upon completion on 19 June.[4][5]West Apaum was built in a total of 78 working days,[3] 92 calendar days,[7] and was tied with three other ships for tenth place on a list of the ten fastest constructed ocean-going vessels compiled in 1920.[7][Note 2] Skinner & Eddy received a $25,000 bonus for completing the ship early.[8]
West Apaum departed Bremerton, Washington, on 27 June for Arica, Chile, to take on a cargo of nitrates for the United States. Sailing from there via the Panama Canal, West Apaum arrived at Savannah, Georgia, on 9 September. From there she sailed for Hampton Roads, Virginia, where she arrived on 10 October. Eight days later, loaded with rolling stock, steel rails, and other general cargo for the United States Army, the cargo ship sailed for France. Delayed at Halifax for repairs to her damaged propeller, West Apaum finally entered the harbor at La Pallice on 22 November, 11 days after the Armistice.[4]
West Apaum unloaded her railroad goods, loaded 2,214 long tons (2,250 t) of Army cargo, and headed for the United States on 13 December. She arrived at Hampton Roads on 3 January 1919. West Apaum made two more voyages to France under Navy control. On her final voyage, she carried airplane materials to France and returned 5,000 long tons (5,100 t) of Army ordnance to New York on 11 July. On 25 July, West Apaum was decommissioned and returned to the USSB.[4]
Civilian career
Little is known about West Apaum's subsequent civilian career. In the first quarter of 1927, it is known that West Apaum was sailing on a New York – Rotterdam route.[9][10] While in this service, The New York Times, in one of just a few mentions the ship received in contemporary news coverage, reported on the transfer of one of West Apaum's crew members to the United States Lines ocean liner Republic at sea. The crewman had fallen into an open hatchway and had fractured his skull. The two ships, located some 200 nautical miles (370 km; 230 mi) west of New York, came within 1⁄4 mile (0.40 km) of each other and the injured man was loaded onto a boat from Republic in the heavy seas. The crewman, though successfully transferred to Republic, died several hours later.[11][12]
By early 1929, West Apaum had been laid up, and was under consideration by the USSB for the installation of pulverized coal-fired boilers for testing purposes,[13] but lost out on the honor to West Alsek.[14] No further information on West Apaum's career is available, but it is known that she was abandoned by the USSB in 1933,[4] and scrapped in the second quarter of that year.[5]
Notes
^Skinner & Eddy was an emergency shipyard that only operated from 1916 until about 1920.
^The other three ships tied for tenth-fastest were West Alsek and West Gotomska—both also constructed by Skinner & Eddy, and Lake Gardner. See: Hurley, p. 93.