This section is 20 km (12 mi) long and it is a part of E30 European route. The section between Emilia and Stryków junctions has been opened on July 26, 2006.[5] Following section between Stryków and Łódź Północ junctions has been opened on December 22, 2008.
This section is 19.3 km (12.0 mi) long and it is a part of E67 European route and DK12 Polish national road. The first section between Róża and Rzgów has been opened on April 11, 2014.[6] The second section between Rzgów and Łódź Południe junction has been opened on July 1, 2016.
This section is 42 km (26 mi) long. The first section between Dobroń and Łódź Lublinek junctions was opened on May 16, 2012 (400 m (1,300 ft) long section between planned Łódź Lublinek junction and Szynkielew III temporary junction, along with a section of DK14 national road between Pabianicka St. in Łódź and Łódź Lublinek junction)[7] and July 13, 2012 (following Dobroń - Szynkielew III section).[8] The second section, between Róża and Dobroń junctions, has been opened on April 11, 2014.[6] The construction of third section, between Emilia and Łódź Lublinek junctions, has begun in 2019[9] and opened in July 2023,[10] thus making Łódź the first city in Poland with a complete beltway.